JRC Construction Diary #17

jrc-exterior-low-resolution.jpg

img_2937.jpg

The exterior of the building continues to take shape. I’ve juxtaposed the computerized rendering (top) with an actual exterior taken yesterday (next down) to give you a comparison of the virtual with the actual. Below, is a pic of the duct work and electric conduit, now installed in the first floor offices. The second pic from the bottom shows the rear stairs (termed the “Stairway to Heaven” by one contruction worker) that leads from the ground floor to the third floor sanctuary. The bottom pic offers a southward view on the third floor. The black pipe is the “rough-in” plumbing for the bathrooms. You can also see the main air duct and the yellow board enclosure that wraps around the elevator shaft.

We’re about five weeks behind schedule, but with good weather, we are still hoping for an early-Jan occupancy date. On the LEED front, we are currently safely in range for a Gold rating with the US Green Building Council and still have a fighting chance for Platinum (the highest rating!) The final determinant will ultimately come down to cost, but whatever happens, we are so very proud to be building synagogue so thoroughly infused with Green values…

img_2935.jpg

img_2903.jpg

img_2920.jpg

0 Responses to “JRC Construction Diary #17”



  1. Leave a Comment

Leave a Reply




Welcome

Welcome to "Shalom Rav," a collection of posts that have nothing much in common other than my desire to share them with you.

While some of my posts are related to my day job (I serve as Rabbi of Jewish Reconstructionist Congregation in Evanston, IL), the opinions I express here are mine alone and do not reflect official stands of my congregation or any organization with which I'm affiliated.

Enter your email address to subscribe to Shalom Rav and receive notifications of new posts by email.

Follow Me on Twitter:

Categories