JRC Construction Diary #14

img_27432.jpg

Here are a few photos from this week – nothing too dramatically different. The leaves are really getting thick on the treetops and the view from the sanctuary’s east window opening is incredibly green (above).

The main supply air duct (next pic down) has been installed from the roof down to the second floor, where we have our main fan system. It is going behind the opening that is being saved for a second elevator which we hope to install sometime in the future.

Our electric transformer from Commonwealth Edison was delivered this week (see bottom pic). Getting service from a utility can often be a challenge but they have been very cooperative with us and we are pleased to have the service on schedule.

img_27501.jpg

img_27511.jpg

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s