JRC Construction Diary #25

img_3810.jpg

Much progress since my last construction update. As you can see from the pix above and below, the framing for the curtainwall on the south face of the building has now been installed. The glass for this façade will be installed over the next week or so. Two pix down: a shot of the ceiling grid that is just going up in the second floor corridor and below that is a sample of the ceiling tile in one of the classrooms. Second from the bottom is a view down the elevator shaft and the drill that will bore a 27 foot deep hole for the piston that will power our large elevator. Finally, there is a photo of the frame of the large retractable door that will separate our sanctuary and social hall.

The move in date (end of January) is coming quick – we’re counting down in weeks now!

img_3808.jpg

img_3806.jpg

img_3804.jpg

img_3805.jpg

img_3795.jpg

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s