JRC Construction Diary #20

img_3319.jpg

There has been some exciting progress on the building, so here’s one more post on the construction before we head off to Israel tomorrow…

The reclaimed cypress siding has started to go up on the exterior walls (see the second and third pix down). The siding will eventually get two coats of clear sealer which will protect and enhance the look of the wood. The Jerusalem stone is now going upon the main wall – the bottom pic shows some of the work that was done yesterday and today. (In case you are wondering, the small shadows on the the stones are made by the spacers that have been placed between the tiles to prepare them for grouting.)

As the pictures above and below indicate, the exterior of the building and the third floor sanctuary window are coming together beautifully. Looking forward to seeing even more progress when I get back to town August 15!

img_3307.jpg

img_3298.jpg

img_3301.jpg

img_3297.jpg

One Reply to “JRC Construction Diary #20”

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s