
There has been some exciting progress on the building, so here’s one more post on the construction before we head off to Israel tomorrow…
The reclaimed cypress siding has started to go up on the exterior walls (see the second and third pix down). The siding will eventually get two coats of clear sealer which will protect and enhance the look of the wood. The Jerusalem stone is now going upon the main wall – the bottom pic shows some of the work that was done yesterday and today. (In case you are wondering, the small shadows on the the stones are made by the spacers that have been placed between the tiles to prepare them for grouting.)
As the pictures above and below indicate, the exterior of the building and the third floor sanctuary window are coming together beautifully. Looking forward to seeing even more progress when I get back to town August 15!




I love the “mosaic” look to the windows. Keep those pictures coming!